FVS for the Three Bridges on the New Verona–Vicenza High-Speed Rail Line
Verona–Vicenza | Completed project
Three arch railway bridges for the high-speed rail line
FVS S.p.A. took part in the construction of three major arch railway bridges for the new Verona–Vicenza high-speed rail line.
The three structures, named Fibbio, Illasi and Alpone, weigh approximately 1,370 tonnes each, for a combined total of 4,110 tonnes of steel structures.
This major infrastructure contract involved considerable dimensions, high construction complexity and stringent technical requirements. The structures are designed to withstand the substantial static and dynamic loads generated by high-speed rail traffic, ensuring safety, stability, durability and long-term reliability.
FVS’s role in the construction of the bridges
Within the project, FVS played a leading operational role, supplying the steel structures for the Fibbio, Illasi and Alpone bridges and taking a direct part in assembly and erection activities.
FVS’s contribution included:
- supply of the steel structures for the three railway bridges;
- management of approximately 1,370 tonnes of structures for each bridge;
- preparation and organisation of components according to the planned sequences;
- coordination of supplies with the progress of on-site activities;
- management of material traceability;
- management and coordination of material testing;
- verification of material documentation and certificates;
- support during assembly operations;
- execution of 65% of the steel structure erection activities;
- participation in the operational stages required to construct the three arch bridges.
FVS’s involvement therefore extended beyond the supply of steel and material preparation. It also included traceability, the management of tests and technical documentation, as well as a substantial share of the erection work. This control system made it possible to track every component through the various operational stages, from initial supply to incorporation into the completed structure.
A contract involving more than 4,100 tonnes
From supply through to on-site erection
FVS’s involvement in the Fibbio, Illasi and Alpone bridges demonstrates the company’s ability to contribute to major infrastructure projects through an integrated service comprising:
- steel procurement and supply;
- processing and preparation of components;
- management of large volumes;
- material traceability and control;
- management of testing and technical documentation;
- logistics organisation;
- assembly of structures;
- on-site erection.
The project is one of the most significant undertakings in which FVS has participated and confirms the company’s ability to operate on large, complex railway infrastructure projects.
FVS S.p.A.: from steel supply and material traceability through to the erection of major steel structures.