FVS for the Cortina Bobsleigh Track – Milano Cortina 2026

Cortina d’Ampezzo | 2025 | Completed project

FVS steel for an Olympic infrastructure project

FVS S.p.A. contributed to the construction of the steel structures for the new bobsleigh track in Cortina d’Ampezzo, one of the landmark venues of the Milano Cortina 2026 Olympic and Paralympic Winter Games.

Taking part in the production chain for a project intended for an international sporting event is important recognition of FVS’s ability to handle complex contracts involving high quality standards, significant volumes and deadlines that were almost impossible to meet.

FVS’s contribution

As part of the project, FVS worked with LMV, providing its expertise in the supply and processing of steel products used to build the venue’s metal structures.

FVS’s ability to manage different types of steel sections and components, together with dedicated facilities for cutting, drilling and custom processing, made it possible to meet the contract’s specific production requirements.

FVS’s contribution focused in particular on:

  • procurement and supply of steel products;
  • preparation of materials in accordance with the project specifications;
  • cutting and drilling operations, where required;
  • management of substantial quantities of steel;
  • organisation of deliveries in line with the production schedule;
  • on-site erection of 90% of the steel structures.

A project of significant scale

The project as a whole required approximately:

2,050 tonnes of steel;

3,200 m² of pre-shaped steel.

These figures refer to the overall scale of the project and reflect the technical and organisational complexity of the new Olympic venue; no two pieces were alike.

FVS’s involvement in the contract reinforces the company’s position as a reliable steel partner for structural steel fabricators and contractors engaged in major infrastructure projects.

The strength of industry. The precision of custom-made solutions.