GYMNASIUM IN MONTEMILETTO (AV)
FVS spa, at the beginning of 2018, supplied about 200 tons of round tubes and pre-machined beams for the construction of the new gymnasium in the sports area of Montemiletto (AV). this structure was made entirely of s355 quality steel; the columns are made of round tubular with a diameter of 508x16mm and a thickness of 273x12.5mm; the main beams are HEA700. The use of pre-machined FVS profiles made it possible to build the structure in the very short time required by the client, although the site, as can be seen from the photos, was not at all easy.